MODERNIZATION OF THE RIGHT LOCK CHAMBER: TEST OF HATCH OPERATION
(21-06-2021)
We experimentally filled the right lock chamber to the level of the upper water in order to further check the seals on the lower double-wing gates. In the right lock chamber of the Gabčíkovo Waterworks are continuing important individual and functional tests on individual buildings. After their successful completion, will begin a comprehensive verification and testing of the chamber.